Projects
From our job sites
Real jobs, labeled by room and city. No stock photos and no renderings on this page.
Before and after
Every frame here comes from Christhian's own videos of these jobs, and both frames in a pair were filmed from about the same spot. During means the work was still underway.
-
Bathroom
Parkland
The view from the doorway. Mid-job the walls were still bare. Now a freestanding tub stands under the three windows, with a chandelier above it.
-
Window wall
Parkland
Gray board and red waterproofing around the windows while the work was underway. The finished wall is covered in wood slat panels.
A kitchen in progress
A kitchen we are working on now. The stone top is on the island and the cabinet frames are built. When the job is done we will take the same photo from the same spot, so you can see the before and after.
Coral Gables kitchen
White shaker cabinets with gold hardware, a waterfall island with white veined countertops, and a black accent wall with an arched range niche.
Miami kitchen
Light wood flat-panel cabinets, white countertops, a waterfall island and wood slat panels under the bar seating.
Primary bathroom
A bathroom remodel in Parkland: a freestanding tub, wood slat wall panels, a brushed gold rain shower, a green vanity and arched windows.
Paint and wall finishes
Textured wall finishes, a wallpaper accent wall and paint work in finished homes.
Work in progress
Some of these photos were taken mid-job. They show the part homeowners usually do not see, like a shower floor being set before the tile goes on.
South Florida jobs
These jobs were in Parkland, Miami and Coral Gables, three of the cities we work in across South Florida. See where we work.
Let us look at your space.
Book a visit. We'll come look at the job with you and then put together your estimate.